Iowa DOT Logo IADOT ISP
Highways
IA 1 3 Reports
IA 2 5 Reports
IA 3 5 Reports
IA 4 4 Reports
IA 5 No Reports
6th Street No Reports
US 6 7 Reports
IA 7 No Reports
IA 8 No Reports
IA 9 1 Report
10th Street No Reports
IA 10 No Reports
11th Street No Reports
12th Street No Reports
IA 12 1 Report
13th Street No Reports
IA 13 No Reports
14th Street 1 Report
IA 14 1 Report
15th Street No Reports
IA 15 No Reports
16th Street No Reports
IA 16 No Reports
17th Street No Reports
IA 17 No Reports
18th Street No Reports
US 18 2 Reports
US 20 7 Reports
IA 21 4 Reports
IA 22 6 Reports
23rd Street No Reports
IA 23 No Reports
IA 24 No Reports
IA 25 No Reports
IA 26 No Reports
IA 27 1 Report
IA 28 1 Report
I-29 17 Reports
US 30 6 Reports
IA 31 No Reports
IA 32 No Reports
US 34 4 Reports
I-35 8 Reports
IA 37 No Reports
IA 38 No Reports
IA 39 No Reports
IA 44 No Reports
IA 48 1 Report
IA 51 1 Report
US 52 5 Reports
US 52 in IL No Reports
IA 56 No Reports
IA 57 2 Reports
IA 58 No Reports
US 59 2 Reports
IA 60 No Reports
Business US 61 5 Reports
US 61 5 Reports
IA 62 No Reports
US 63 4 Reports
IA 64 No Reports
US 65 3 Reports
US 67 2 Reports
US 69 4 Reports
IA 70 No Reports
US 71 No Reports
I-74 11 Reports
US 75 2 Reports
US 75 Nebraska No Reports
IA 76 2 Reports
US 77 No Reports
US 77 Nebraska No Reports
IA 78 2 Reports
I-80 42 Reports
I-80 Nebraska No Reports
IA 81 No Reports
IA 83 No Reports
IL 84 No Reports
IA 85 No Reports
IA 86 No Reports
IA 92 4 Reports
IA 93 No Reports
IA 96 No Reports
IA 98 No Reports
IA 100 4 Reports
IA 110 No Reports
IA 116 No Reports
IA 117 No Reports
IA 122 1 Report
IA 127 1 Report
IA 128 No Reports
I-129 No Reports
IA 130 No Reports
IA 136 No Reports
US 136 No Reports
IA 137 No Reports
IA 139 No Reports
IA 140 No Reports
IA 141 No Reports
IA 143 No Reports
IA 144 No Reports
IA 146 1 Report
IA 148 No Reports
IA 149 1 Report
IA 150 No Reports
US 151 1 Report
IA 160 1 Report
IA 163 1 Report
US 169 No Reports
IA 173 No Reports
IA 175 5 Reports
IA 182 No Reports
IA 183 No Reports
IA 187 No Reports
IA 188 No Reports
IA 191 No Reports
IA 192 No Reports
IA 202 No Reports
IA 210 No Reports
IA 212 No Reports
US 218 7 Reports
IA 220 No Reports
IA 224 No Reports
I-235 7 Reports
US 275 1 Report
I-280 2 Reports
IA 281 No Reports
IA 316 No Reports
IA 330 No Reports
IA 333 1 Report
IA 346 No Reports
IA 376 No Reports
I-380 13 Reports
IA 404 No Reports
IA 415 3 Reports
IA 438 No Reports
IA 471 No Reports
I-480 No Reports
I-680 4 Reports
I-680 Nebraska No Reports
IA 922 2 Reports
IA 930 No Reports
IA 946 No Reports
IA 965 No Reports
Airline Highway No Reports
Broderick Dr No Reports
Calvert Drive No Reports
Gilbert Street 1 Report
Grant Street No Reports
Great River Trail No Reports
Jefferson St No Reports
Kimberly Road NB 1 Report
Kimberly Road SB 1 Report
Lincoln Road No Reports
Middle Road No Reports
Mississippi Boulevard No Reports
River St No Reports
Sabula-Savanna Ferry No Reports
Wayne King Dr No Reports
Road Reports—Statewide
Map of Statewide Between 13th Street; Calvert Drive and Lincoln Road (Bettendorf). The roadway is reduced to one lane due to road construction work. Until December 3, 2019 at about 6:00AM CDT. Between Exit 104: County Road P57 (near Earlham) and Exit 121: Jordan Creek Parkway (West Des Moines). The roadway is reduced to one lane because of night time construction work. There is a width limit in effect. Width limit 16'0". From 9:00PM CDT to 5:00AM CDT on Sunday and from 7:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until June 27, 2019 at about 6:00AM CDT. Between County Road B20 and IA 122 (near Mason City). The roadway is reduced to one lane due to road construction work. Until July 5, 2019 at about 11:59PM CDT. Between Exit 1 - River Drive (Moline) and Exit 4: US 67; Grant Street and State Street (Bettendorf). The roadway is reduced to one lane due to road construction work. There is a height limit in effect. Height limit 15'8". Until December 3, 2019 at about 8:00AM CDT. Between Exit 3 - Avenue of the Cities and Exit 1 - River Drive (Moline). The road is closed due to bridge construction work. A detour is in operation. Until November 26, 2019 at about 8:00AM CDT. Between Exit 4: US 67; Grant Street and State Street and Exit 3: Middle Road and Locust Street (Bettendorf). The road is closed due to road construction work. A detour is in operation. Until December 3, 2019 at about 8:00AM CDT. Between Exit 61: I-680; County Road G37 (near Crescent) and Exit 71: I-680 (1 mile south of the Missouri Valley area). The road is closed because of flooding. A detour is in operation. Between Exit 306: US 67 (Bettendorf) and Exit 295A: Business US 61; US 61; Brady Street (Davenport). The roadway is reduced to one lane because of night time construction work. There is a width limit in effect. Width limit 11'0". From 7:00PM CDT to 6:00AM CDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Until September 26, 2019 at about 6:00AM CDT. Between Franklin St and Airline Highway (Waterloo). The road is closed due to road construction work. A detour is in operation. There is a height limit in effect. Height limit 15'0". Until November 26, 2019 at about 4:00PM CDT. Between the Missouri State Line and US 136 (Keokuk). The road is closed because of flooding. A detour is in operation. Between Exit 56: IA 192; North 16th Street and Exit 55: North 25th Street (Council Bluffs). The road is closed because of flooding. A detour is in operation. Between the Missouri State Line and IA 333 (near Hamburg). The road is closed because of flooding. Between County Road Y21 (Rickardsville) and County Road X71 (Holy Cross). The road is closed due to road construction work. A detour is in operation. Until November 1, 2019 at about 12:00PM CDT. Between I-29; County Road J64 and US 275 (near Hamburg). The road is closed because of flooding. Between US 30 (1 mile south of the Newhall area) and County Road E44 (near Van Horne). The road is closed due to road construction work. A detour is in operation. Until January 31, 2020 at about 3:00PM CDT. Between County Road E49 and US 30 (near Le Grand). The road is closed due to road construction work. A detour is in operation. Until June 28, 2019 at about 4:00PM CDT. Between US 59 (Shenandoah) and County Road J20 (Essex). The roadway is reduced to one lane due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 3:00PM CDT on weekdays. Until August 15, 2019 at about 3:00PM CDT. Between County Road M37 (near Emerson) and IA 48 (Red Oak). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. There is a width limit in effect. There is a height limit in effect. Width limit 11'1". Height limit 15'0". Until August 1, 2019 at about 3:00PM CDT. Between County Road T47 and County Road T53 (near Morrison). The road is closed due to bridge construction work. A detour is in operation. Until August 30, 2019 at about 4:00PM CDT. Between County Road K18 and IA 3 (2 to 3 miles north of the Sioux City area). The roadway is reduced to one lane due to road construction work. Look out for temporary traffic lights. Until July 12, 2019 at about 3:00PM CDT. Between Exit 2: 22nd Street and Exit 3: 8th Street and 73rd Street (West Des Moines). Multiple Waze users reported standstill traffic. Between County Road S34 and County Road B30 (Mason City). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 80 ft. Until November 28, 2019 at about 8:00AM CDT. Between the Missouri River bridge and US 275; County Road J46 (Sidney). The road is closed because of flooding. A detour is in operation. Between Nebraska State Line (2 miles west of the Pacific Junction area) and I-29 (near Pacific Junction). The road is closed because of flooding. A detour is in operation. Between Exit 313: IA 946 and the Mississippi River bridge (Dubuque). The road is closed due to bridge construction work. A detour is in operation. From 6:00AM CDT to 3:00PM CDT on weekdays. Until July 3, 2019 at about 3:00PM CDT. Between IA 22 and US 67 (Davenport). The road is closed because of flooding. A detour is in operation. Between US 65 and County Road S56 (near Mason City). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 16'0". Until July 3, 2019 at about 5:00PM CDT. Between Centennial Bridge and 8th Street (Davenport). The road is closed because of flooding. A detour is in operation. Between The Missouri State Line (near Hamburg) and Exit 35: US 34; US 275 (near Pacific Junction). The road is closed because of flooding. A detour is in operation. Between Exit 36: County Road R35 (near New Virginia) and Exit 68: IA 5 (West Des Moines). The roadway is reduced to one lane due to road construction work. Until June 26, 2019 at about 7:00PM CDT. Between County Road W38 and I-80 (Tiffin). The roadway is reduced to one lane due to road construction work. Look out for flaggers. From 6:00AM CDT to 7:00AM CDT on weekdays. Until November 15, 2019 at about 7:00PM CDT. Between County Road M16 (Hastings) and US 59 (Emerson). The roadway is reduced to one lane due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 15'0". From 7:00AM CDT to 3:00PM CDT on weekdays and Saturday. Until June 27, 2019 at about 3:00PM CDT. Between US 59 (Oakland) and IA 48 (near Lewis). The roadway is reduced to one lane because of construction work. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 7:00PM CDT on weekdays and Saturday. Until Thursday, at about 3:00PM CDT.
US 52 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
I-380 northbound: Entrance ramp closed, due to road construction work.
Kimberly Road SB northbound: Roadway reduced to one lane, due to road construction work.
I-80 eastbound: Roadway reduced to one lane, due to night time construction work, width limit in effect.
Business US 61 (US 61B) southbound: Entrance ramp closed, due to bridge construction work, detour in operation, see map for detour(s).
US 65 southbound: Roadway reduced to one lane, due to road construction work.
I-74 westbound: Roadway reduced to one lane, due to road construction work, height limit in effect.
I-74 westbound: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
US 151 northbound: Roadway reduced to one lane, due to road construction work, width limit in effect.
I-74 westbound: Road closed, due to road construction work, detour in operation, see map for detour(s).
I-29 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
I-80 westbound: Roadway reduced to one lane, due to night time construction work, width limit in effect.
US 63 in both directions: Road closed, due to road construction work, detour in operation, height limit in effect, see map for detour(s).
US 61 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
IA 4 in both directions: Roadway reduced to one lane, due to bridge construction work, temporary traffic lights, height limit in effect, width limit in effect.
I-29 southbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
I-380 southbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
I-29 southbound: Road closed, because of flooding, detour in operation, see map for detour(s).
I-680 in both directions: Exit ramp closed, because of flooding.
I-380 southbound: Entrance ramp closed, due to road construction work.
I-680 in both directions: Entrance ramp closed, because of flooding.
US 275 in both directions: Road closed, because of flooding.
I-80 eastbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
14th Street in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
US 59 in both directions: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
I-80 westbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
IA 415 in both directions: Exit ramp closed, due to road construction work.
IA 415 in both directions: Entrance ramp closed, due to road construction work.
US 52 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
US 218 northbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
US 20 eastbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
US 20 westbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
US 20 eastbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
IA 333 in both directions: Road closed, because of flooding.
US 218 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
IA 146 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
I-380 southbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
US 63 in both directions: Road closed, due to road construction work, detour in operation, see map for detour(s).
US 20 eastbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
IA 48 in both directions: Roadway reduced to one lane, due to road construction work, pilot car in operation, look out for flaggers, width limit in effect.
US 34 in both directions: Roadway reduced to one lane, due to road construction work, temporary traffic lights, width limit in effect, height limit in effect.
IA 175 in both directions: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
IA 12 in both directions: Roadway reduced to one lane, due to road construction work, temporary traffic light.
I-29 southbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
IA 4 in both directions: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
I-235 eastbound: Standstill traffic.
IA 122 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, length limit in effect.
I-235 westbound: Heavy traffic jam.
I-80 westbound: Standstill traffic.
US 6 eastbound: Heavy traffic jam.
IA 1 northbound: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
I-380 northbound: Exit ramp closed, due to road construction work, detour in operation, see map for detour(s).
I-380 northbound: Entrance ramp closed, due to road construction work.
IA 127 in both directions: Roadway reduced to one lane, due to road construction work, temporary traffic lights, height limit in effect, width limit in effect.
I-80 westbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
IA 2 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
US 34 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
I-29 in both directions: Entrance ramp closed, because of flooding.
US 20 eastbound: Road closed, due to bridge construction work, detour in operation, see map for detour(s).
I-29 in both directions: Exit ramp closed, because of flooding.
I-29 in both directions: Entrance ramp closed, because of flooding.
I-29 in both directions: Exit ramp closed, because of flooding.
I-29 in both directions: Entrance ramp closed, because of flooding.
I-29 in both directions: Exit ramp closed, because of flooding.
Business US 61 (US 61B) in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
US 18 eastbound: Roadway reduced to one lane, due to road construction work, width limit in effect.
US 67 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
Gilbert Street in both directions: Road closed, due to road construction work.
I-29 in both directions: Road closed, because of flooding, detour in operation, see map for detour(s).
I-35 in both directions: Roadway reduced to one lane, due to road construction work.
US 6 in both directions: Roadway reduced to one lane, due to road construction work, look out for flagger.
I-29 in both directions: Entrance ramp closed, because of flooding.
I-29 in both directions: Exit ramp closed, because of flooding.
I-29 in both directions: Exit ramp closed, because of flooding.
I-29 in both directions: Entrance ramp closed, because of flooding.
US 34 in both directions: Roadway reduced to one lane, due to road construction work, pilot car in operation, look out for flaggers, width limit in effect.
Business US 61 (US 61B) southbound: Exit ramp closed, due to bridge construction work, detour in operation, see map for detour(s).
US 6 in both directions: Roadway reduced to one lane, because of construction work, look out for flaggers, pilot car in operation, width limit in effect.
I-680 westbound: Roadway reduced to one lane, due to bridge construction work, width limit in effect.
IA 76 in both directions: Roadway reduced to one lane, because of flooding.
IA 92 in both directions: Road closed, because emergency repairs are in progress, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service