Personalized 511 account features are now available on the new 511 website.Sign in (or sign up!) and leave us feedback. X
Iowa DOT Logo IADOT ISP
US 61 - Critical Reports
Show all Road Reports on US 61
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 61
Map of Reports on US 61 Between US 34 (Burlington) and IA 78; County Road H22 (near Mediapolis). The right shoulder is closed due to road construction work. Until December 31, 2021 at about 1:00PM CDT. Between IA 78; County Road H22 (near Mediapolis) and US 34 (Burlington). The right shoulder is closed due to road construction work. Until December 31, 2021 at about 1:00PM CDT. Between the Mississippi River bridge and IA 946 (Dubuque). Road construction work is in progress. A lane is closed intermittently. From 7:00AM CDT to 7:00PM CDT on weekdays and Saturday. Until May 20, 2021 at about 7:00PM CDT. Between IA 946 and the Mississippi River bridge (Dubuque). Road construction work is in progress. A lane is closed intermittently. From 7:00AM CDT to 7:00PM CDT on weekdays and Saturday. Until May 20, 2021 at about 7:00PM CDT. Between the Mississippi River bridge and IA 946 (Dubuque). The right lane is closed due to road construction work. From 8:00AM CDT to 7:00PM CDT on weekdays and Saturday. Until May 19, 2021 at about 7:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service