Iowa DOT Logo IADOT ISP
Critical Reports on I-74
Map of Reports on I-74 Between Exit 3: Middle Road and Locust Street (Bettendorf) and Exit 1: 53rd Street (Davenport). The shoulder is closed due to road construction work. From 6:00AM CST to 6:00PM CST on weekdays. Until November 22, 2019 at about 6:00PM CST. Between Exit 3: Middle Road and Locust Street and Exit 4: US 67; Grant Street and State Street (Bettendorf). The left shoulder is closed due to road construction work. Until December 3, 2019 at about 11:59PM CST. Between Exit 4: US 67; Grant Street and State Street and Exit 3: Middle Road and Locust Street (Bettendorf). The road is closed due to road construction work. A detour is in operation. Until December 3, 2019 at about 8:00AM CST. Between Exit 3: Avenue of the Cities and Exit 1 - River Drive (Moline). The road is closed due to bridge construction work. A detour is in operation. Until November 26, 2019 at about 8:00AM CST. Between Exit 3: Avenue of the Cities and Exit 1 - River Drive (Moline). The road is closed due to bridge construction work. A detour is in operation. Until November 26, 2019 at about 8:00AM CST. Between Exit 3: Avenue of the Cities and Exit 1 - River Drive (Moline). The road is closed due to bridge construction work. A detour is in operation. Until November 26, 2019 at about 8:00AM CST.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service