We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
IA 9 - Critical Reports
Show all Road Reports on IA 9
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on IA 9
Map of Reports on IA 9 Between County Road S56 and County Road S62 (near Plymouth). Expect single line traffic alternating directions due to road construction work. Look out for temporary traffic lights. There is a width limit in effect. There is a height limit in effect. Height limit 15'0". Width limit 10'6". Until October 1, 2020 at about 5:00PM CDT. Between IA 76 (Waukon) and IA 26 (Lansing). There are alternating lane closures due to road construction work. Look out for flaggers. A pilot car is in operation. From 7:00AM CDT to 6:30PM CDT on weekdays. Until November 27, 2020 at about 4:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service