We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
US 30 - Critical Reports
Show all Road Reports on US 30
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 30
Map of Reports on US 30 Between I-29 (Missouri Valley) and IA 127 (Logan). There are alternating lane closures due to road construction work. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Width limit 14'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until August 20, 2020 at about 2:00PM CDT. Between County Road N20 and US 71 (Carroll). The roadway is shared with opposing traffic due to road construction work. There is a weight limit in effect. There is an axle load limit in effect. No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until August 20, 2020 at about 2:00PM CDT. Between 580th Avenue; County Road R70 and County Road S27 (Nevada). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. There is a weight limit in effect. There is an axle load limit in effect. Width limit 12'0". No vehicles over 80,000 lbs. Axle weight limit 20,000 lbs. Until August 20, 2020 at about 12:00PM CDT. Between County Road T47 and County Road T47 (near Montour). The roadway is shared with opposing traffic due to road construction work. There is a weight limit in effect. There is an axle load limit in effect. Axle weight limit 20,000 lbs. No vehicles over 156,000 lbs. Until November 24, 2020 at about 4:00PM CDT. Between Exit 204: Business US 30; L Avenue (Tama) and IA 21 (near Elberon). Look out for a slow moving maintenance vehicle due to road construction work. Until September 3, 2020 at about 4:30PM CDT. Between IA 922; US 151 and County Road W8E (Cedar Rapids). There are alternating lane closures because of night time construction work. From 6:00PM CDT to 6:00AM CDT on Sunday and from 7:00PM CDT to 6:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until August 7, 2020 at about 6:00AM CDT. Between US 151 (near Mount Vernon) and County Road X40 (near Mechanicsville). A lane is closed intermittently due to road construction work. Look out for flaggers. From 6:00AM CDT to 9:00PM CDT daily. Until August 18, 2020 at about 9:00PM CDT. Between US 61 and County Road Y62 (De Witt). The left lane is closed due to road construction work. From 6:00AM CDT to 8:00PM CDT on weekdays. Until July 29, 2020 at about 5:00PM CDT. Between County Road Y62 and US 61 (De Witt). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 15'6". Until August 19, 2020 at about 8:00PM CDT. Between County Road Z36 and the Mississippi River bridge (Clinton). There are alternating lane closures due to road construction work. From 7:30AM CDT to 2:30PM CDT on weekdays. Until August 28, 2020 at about 2:30PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service