Iowa DOT Logo IADOT ISP
Ended Event:
US 63 in both directions: Road closed.

Between Franklin St and Airline Highway (Waterloo). The road is closed due to road construction work. A detour is in operation. There is a height limit in effect. Height limit 15'0". Until November 26, 2019 at about 4:00PM CST.

Web Comment: New Hampton RCE (800-373-7343) - Black Hawk County

Last updated on April 18
See Waterloo area traffic map
US 63 in both directions: Road closed.
Map of US 63 in both directions: Road closed.
Zoom In
Zoom Out
Expired: (US 63 in both directions: Road closed, due to road construction work, detour in operation, height limit in effect, see map for detour(s).)
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service