Iowa DOT Logo IADOT ISP
US 61
US 61 in both directions: Alternating lane closures, due to road construction work.
Between the Missouri State Line and US 136 (Keokuk). There are alternating lane closures due to road construction work. From 6:30AM CDT to 1:00PM CDT on weekdays. Until July 29, 2019 at about 1:00PM CDT.
US 61 southbound: Right shoulder closed, due to road construction work.
Between County Road H40 and US 34 (near West Burlington). The right shoulder is closed due to road construction work. Until September 10, 2019 at about 1:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 61
Map of Reports on US 61
US 61 in both directions: Alternating lane closures, due to road construction work.
US 61 southbound: Right shoulder closed, due to road construction work.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service