We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
IA 2
IA 2 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect, gross weight limit in effect, axle load limit in effect.
Between the Missouri River bridge and I-29 (Sidney). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. There is a weight limit in effect. There is an axle load limit in effect. Width limit 12'0". No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until July 31, 2020 at about 5:00PM CDT.
IA 2 in both directions: Alternating lane closures, due to road construction work, look out for flagger.
Between US 63 (Bloomfield) and IA 1 (4 miles east of the Cantril area). There are alternating lane closures due to road construction work. Look out for flaggers. From 6:00AM CDT to 8:00PM CDT on weekdays. Until August 17, 2020 at about 1:00PM CDT.
IA 2 in both directions: Alternating lane closures, due to road construction work, temporary traffic light.
Between US 218 (Donnellson) and US 61 (Fort Madison). There are alternating lane closures due to road construction work. Look out for temporary traffic lights. Until July 29, 2020 at about 1:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on IA 2
Map of Reports on IA 2 Between the Missouri River bridge and I-29 (Sidney). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. There is a weight limit in effect. There is an axle load limit in effect. Width limit 12'0". No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until July 31, 2020 at about 5:00PM CDT. Between US 63 (Bloomfield) and IA 1 (4 miles east of the Cantril area). There are alternating lane closures due to road construction work. Look out for flaggers. From 6:00AM CDT to 8:00PM CDT on weekdays. Until August 17, 2020 at about 1:00PM CDT. Between US 218 (Donnellson) and US 61 (Fort Madison). There are alternating lane closures due to road construction work. Look out for temporary traffic lights. Until July 29, 2020 at about 1:00PM CDT.
IA 2 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect, gross weight limit in effect, axle load limit in effect.
IA 2 in both directions: Alternating lane closures, due to road construction work, look out for flagger.
IA 2 in both directions: Alternating lane closures, due to road construction work, temporary traffic light.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service