Iowa DOT Logo IADOT ISP
Road Reports
I-80 Whole Road 13 reports
Council Bluffs to Adair No reports
Adair to Des Moines 2 reports
Des Moines Metro W to Des Moines Metro NE 5 reports
Des Moines to Iowa City 4 reports
Iowa City to Davenport 5 reports
Reports on I-80
Map of Reports on I-80 Between Exit 110: US 169; US 6 (De Soto) and Exit 117: County Road R22 (near Van Meter). The shoulder is closed because of construction work. From 9:00AM CST to 3:00PM CST on weekdays. Until January 31, 2019 at about 3:00PM CST. Between Exit 110: US 169; US 6 (De Soto) and Exit 117: County Road R22 (near Van Meter). A lane is closed intermittently due to road construction work. From 9:00AM CST to 3:00PM CST on weekdays. Until January 31, 2019 at about 3:00PM CST. Between Exit 125: US 6; Hickman Road and Exit 129: Northwest 86th Street (Urbandale). The shoulder is closed due to road construction work. Until March 31, 2019 at about 11:59PM CST. Between Exit 129: Northwest 86th Street and Exit 127: IA 141; Northwest Urbandale Drive (Urbandale). The right shoulder is closed due to road construction work. Until March 31, 2019 at about 11:59PM CST. Between Exit 143: 1st Avenue North and North East 72nd Street (Altoona) and Exit 211: County Road V52 (3 miles east of the Victor area). The shoulder is closed because of utility work. From 9:00AM CST to 3:00PM CST on weekdays. Until February 4, 2019 at about 3:00PM CST. Between Exit 237: Ireland Avenue (Tiffin) and US 6 (Coralville). The shoulder is closed due to road construction work. Until August 3, 2020 at about 5:00PM CST. Between Exit 244: Dubuque Street and Exit 254: County Road X30 (near Iowa City). The right shoulder is closed due to road construction work. From 9:00AM CST to 3:00PM CST on weekdays. Until January 31, 2019 at about 3:00PM CST. Between Exit 284: County Road Y40 (Walcott) and Exit 295A: US 61; Business US 61; Brady Street (Davenport). The right shoulder is closed because of construction work. Until May 2, 2019 at about 4:00PM CST. Between Exit 290: I-280; US 6 (Davenport) and Exit 301: Middle Road (Bettendorf). The shoulder is closed due to road construction work. From 6:00AM CST to 8:00PM CST on weekdays and Saturday. Until January 31, 2019 at about 8:00PM CST. Between Exit 298: I-74 (Bettendorf) and the Mississippi River bridge (Le Claire). The shoulder is closed due to road construction work. From 6:00AM CST to 8:00PM CST on weekdays and Saturday. Until January 31, 2019 at about 8:00PM CST.
I-80 in both directions: Shoulder closed, because of construction work.
I-80 in both directions: Intermittent lane closure, due to road construction work.
I-80 in both directions: Shoulder closed, due to road construction work.
I-80 westbound: Entrance ramp closed, due to road construction work, detour in operation, see map for detour(s).
I-80 westbound: Right shoulder closed, due to road construction work.
I-80 in both directions: Shoulder closed, because of utility work.
I-80 in both directions: Shoulder closed, due to road construction work.
I-80 eastbound: Ramp restrictions in force, right exit ramp, road construction, width limit in effect.
I-80 westbound: Shoulder closed, due to road construction work.
I-80 in both directions: Right shoulder closed, due to road construction work.
I-80 eastbound: Right shoulder closed, because of construction work.
I-80 in both directions: Shoulder closed, due to road construction work.
I-80 in both directions: Shoulder closed, due to road construction work.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service