Iowa DOT Logo IADOT ISP
Road Reports
IA 3 Whole Road 3 reports
Westfield to Humboldt 1 report
Humboldt to Waverly 2 reports
Waverly to Dubuque No reports
Reports on IA 3
Map of Reports on IA 3 Between County Road N14 (near Albert City) and IA 4 (Pocahontas). Expect single line traffic alternating directions due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 14'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until September 26, 2019 at about 2:00PM CDT. Between IA 188 (near Clarksville) and IA 116 (Waverly). Expect single line traffic alternating directions due to road construction work. A pilot car is in operation. Look out for flaggers. From 6:00AM CDT to 7:00PM CDT on weekdays. Until October 24, 2019 at about 5:00PM CDT.
IA 3 in both directions: Single line traffic - alternating directions, due to road construction work, pilot car in operation, look out for flaggers, width limit in effect.
IA 3: Single line traffic - alternating directions, due to road construction work, pilot car in operation, look out for flagger.
IA 3 in both directions: Single line traffic - alternating directions, due to road construction work, temporary traffic lights, height limit in effect, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Warning Warning

Lane Closure Lane Closure Construction Construction Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Accident Waze: Accident

Closure Waze: Closure Open Ferry Service Operating Closed Ferries Out of Service