We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
US 59
US 59 in both directions: Intermittent lane closure, due to road construction work, temporary traffic light, width limit in effect. Width limit 16'0".
Between County Road G30 and County Road F58 (Avoca). A lane is closed intermittently due to road construction work. Look out for temporary traffic lights. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 6:00PM CDT on weekdays and Saturday. Until August 8, 2020 at about 3:00PM CDT.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 59
Map of Reports on US 59 Between County Road G30 and County Road F58 (Avoca). A lane is closed intermittently due to road construction work. Look out for temporary traffic lights. There is a width limit in effect. Width limit 16'0". From 7:00AM CDT to 6:00PM CDT on weekdays and Saturday. Until August 8, 2020 at about 3:00PM CDT. Between County Road E59 (near Buck Grove) and US 30 (Denison). A lane is closed intermittently due to road construction work. From 7:30AM CDT to 5:00PM CDT on weekdays. Until July 19, 2020 at about 5:00PM CDT.
US 59 in both directions: Intermittent lane closure, due to road construction work, temporary traffic light, width limit in effect. Width limit 16'0".
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures