We've been listening to you. Try phase 2 of our updated 511 website and let us know what you think. X
Iowa DOT Logo IADOT ISP
Truck Restrictions
I-29 Whole Road 5 reports
Iowa - Missouri Border to Council Bluffs 3 reports
Council Bluffs to Sloan 2 reports
Sloan to Sioux City No reports
Truck Restrictions on I-29
Map of Reports on I-29 Between The Missouri State Line (near Hamburg) and Exit 47: IA 92; US 275 (Council Bluffs). There are alternating lane closures due to road construction work. From 6:30AM CDT to 6:00PM CDT daily. Until Friday, at about 6:00PM CDT. Between The Missouri State Line (near Hamburg) and Exit 42: County Road H10 (near Pacific Junction). A lane is closed intermittently due to road construction work. There is a width limit in effect. Width limit 16'0". Until September 30, 2020 at about 5:00PM CDT. Between Exit 42: County Road H10 and Exit 55: North 25th Street (Council Bluffs). A lane is closed intermittently due to road construction work. From 9:00AM CDT to 3:00PM CDT on weekdays. Until December 31, 2020 at about 3:00PM CDT. Between Exit 52: Nebraska Avenue and Exit 53A: 9th Avenue (Council Bluffs). There are alternating lane closures because of night time construction work. From 10:00PM CDT to 9:30AM CDT on Friday and from 8:00PM CDT to 6:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until Saturday, at about 9:30AM CDT. Between Exit 75: US 30 (Missouri Valley) and Exit 89: IA 127 (near Modale). The roadway is shared with opposing traffic due to road construction work. There is a weight limit in effect. There is an axle load limit in effect. No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until October 2, 2020 at about 2:00PM CDT. Between Exit 95: County Road F20 (near Little Sioux) and Exit 89: IA 127 (near Mondamin). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 30, 2020 at about 1:00PM CDT. Between Exit 141: 1st Street and Sioux Gateway Airport (Sergeant Bluff) and Exit 151: IA 12; Riverside Boulevard (Sioux City). Major road construction work is in progress. Until October 9, 2020 at about 5:00PM CDT.
I-29 in both directions: Intermittent lane closure, due to road construction work, width limit in effect. Width limit 16'0".
I-29 southbound: Roadway reduced to one lane, due to bridge construction work, width limit in effect. Width limit 14'0".
I-29 northbound: Roadway reduced to one lane, due to road construction work, width limit in effect. Width limit 16'0".
I-29 in both directions: Opposing traffic sharing the roadway, due to road construction work, gross weight limit in effect, axle load limit in effect. No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs.
I-29 southbound: Roadway reduced to one lane, due to road construction work, width limit in effect. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction
See Road Reports for all closures